Two decks and a finished basement in Appleton.

Front and back decks, a finished basement, paint and new lighting throughout.

BeforeThe front entry before the deck
AfterAppleton, Wisconsin

Swipe for project details

Town
Appleton, Wisconsin
Project type
Decks and interior refresh
Scope
Front deck with stairs and railings; rear deck; basement finishing, including the bar, desk nook, lounge and bathroom; interior painting and drywall patching; new light fixtures throughout; furnishing.
Trades
Carpentry, Painting, Lighting

Project notes.

What we did

LJM2 built two new decks, one at the front entry and one at the back door, finished the basement, painted and patched throughout, replaced the light fixtures and furnished the house.

How it turned out

The front door now opens onto a stained timber deck with stairs and railings, and the back door steps out onto a second deck. The basement has a bar, a desk nook, a lounge and a remodeled bathroom. The photographs show the finished, furnished house.

Where the work started.

The original exterior, the unfinished basement, the old basement bathroom, and the rear deck before its railings and stain.

From bare plaster to a finished bath.

Before: the old basement bathroom with rough plaster walls and a plain shower stall.
Before: the old basement bathroom.
Basement bathroom shower with white tile surround and a black-framed sliding glass door.
After: new tile, shower and fixtures.

Decks, basement and every room furnished.

Both decks, the finished basement and the furnished rooms. Select a photo for a closer look.

Start a conversation

What are you
planning?

Request an estimatePrefer to talk first? Call 920-475-9798

Planning repairs connected to an insurance claim? Select Insurance claim in the estimate form so we understand how the project is being funded.